Footing and ground-beam formwork on one of our sites

Building the future with quality and precision

From foundation to the final touch

  • Shell construction
  • Finishing
  • Project management
  • Excavation
  • Property management

We build residential villas from excavation and footings through the shell to finishing, following every stage in order. Our office is in Al Bandariyah, Al Khobar.

Send us your plans and AutoCAD files so we can prepare your quote.

2021Company founded in October 2021
Al KhobarAl Bandariyah — Eastern Province
Dig to handoverShell construction & finishing for villas
Property managementRental contracts & real estate marketing

What we do

From the first dig to the final touch

We work on your project from day one: excavation and earthworks, the shell structure, finishing, and project management. We also have a property management and real estate marketing department.

Shell construction

The concrete structure from footings to the last roof: rebar, formwork, pours and blockwork, floor by floor.

Finishing

After the shell, we carry on with finishing works to the plans and specifications agreed with you.

Project management

Stage-by-stage follow-up, coordinated with the consultant and the insurance inspector at every handover.

Excavation & earthworks

Excavation and shoring, soaking and compacting the soil, and backfilling in layers with compaction tests.

Service details →

About us

Ibrahim Yousef Al-Jadidi Company

We build residential villas from excavation and footings to the complete shell, and carry on with finishing. Our office is in Al Bandariyah, Al Khobar, and we work across the Eastern Province.

«Building the future with quality and precision»

More about us
Villa with the shell structure complete

How we work

Stage after stage, in order

These are the shell stages we follow on every villa, before moving on to finishing.

  1. Excavation & ground prep

    Excavation, shoring, soaking and compacting the soil, then the soil test.

  2. Footings

    Setting out by the surveyor, blinding concrete, waterproofing, formwork, rebar and the pour.

  3. Necks & ground beams

    Starter bars and footing necks, bitumen waterproofing, ground beams, then backfill and compaction.

  4. Ground slab & columns

    Anti-termite treatment and polythene sheet, the ground slab, then ground-floor columns.

  5. Roofs & blockwork

    Slab formwork, rebar and MEP sleeves, the pour and water curing, then blockwork — repeated for every floor.

  6. Parapet & handover

    The parapet beam after the last roof, cleaning and handover of the shell, then on to finishing.

No pour before approval: Before footings, ground beams, columns and roofs are poured, the consultant and the insurance inspector check and approve; only then do we pour. After each pour the concrete is water-cured.

From our sites

Photos from our projects

Real photos from our work sites in the Eastern Province.

See all photos

Get a quote

Have a plot and ready to build?

Send us your plans (PDF or images) and AutoCAD files (DWG/DXF); we’ll study them and prepare your quote.